The kitchen is about 2/3 to 3/4 done. The upper walls are painted and 4 of the 8 cabinets are in place. The corner unit is now also in place and the range is now on the right hand side going into the kitchen. It makes the kitchen seem smaller to me but in a good way. Its not a huge open space with little things around the edges anymore.
From The Blog
Kitchen Capers
The kitchen is about 2/3 to 3/4 done. The upper walls are painted and 4 of the 8 cabinets are in place. The corner unit is now also in place and the...